Start with how you cook, not with the catalogue
Before a single finish is chosen, spend a week noticing how your kitchen is used. Where do bags land? Who walks through while someone is at the hob? Which cupboard is opened most often? Design decisions that ignore these patterns look beautiful in photographs and feel awkward within a month.
The brief should cover storage pressure points, appliance preferences, lighting at different times of day, and whether the room needs to work as a social space. Get this written down — it becomes the test every later decision is measured against.
Design and documentation
Concept design settles the layout: work zones, walkways, door swings, window positions and where the tall storage goes. Technical design then confirms the unglamorous parts — plumbing routes, electrical circuits, extraction, structural openings and floor levels.
This is the stage where a drawn line becomes a costed item. It is also the cheapest stage to change your mind.
Ordering before demolition
Cabinetry, worktops, appliances, tiles and specialist fittings all have lead times, and they do not run in parallel by accident. Orders are placed and checked before the room is stripped, because a kitchen sitting half-built while it waits for a worktop template is the most common cause of a stalled programme.
- Confirm measurements and service positions before ordering
- Check that appliances and cabinetry are compatible
- Agree delivery slots and where materials will be stored
- Keep a single list of what has arrived and what has not
Demolition, first fix and behind-the-wall work
Strip-out is fast and messy; protection of adjoining rooms matters more than speed here. First fix covers electrical runs, plumbing, drainage, extraction ducting and any structural steel.
Waterproofing around wet areas and correct falls on drainage are invisible once tiling begins, and they are the most expensive things to get wrong. Insist on seeing them checked before they are closed up.
Second fix, finishes and snagging
Plastering and tiling complete the shell. Cabinetry then goes in, followed by worktops, splashbacks, appliances, sinks and taps, lighting and final decoration. Sequencing matters: the worktop template usually comes after cabinets are level and fixed.
The last phase is snagging — the small alignment, sealing and touch-up items. Build in time for it. A handover walkthrough with a written list is far more effective than raising issues weeks later.
Living through it
Most households can stay during interior work if the schedule is phased. Agree quiet hours, keep one room genuinely usable, seal doorways with zipped dust barriers, and accept that a temporary kitchen corner will be part of daily life for a while.
Plan simple meals, keep a box of everyday items you will need immediately, and label it clearly. Small preparation prevents a great deal of frustration.
Key takeaways
- The brief should describe how you live, not only what you like the look of.
- Design and documentation are the cheapest stages to make changes — use them.
- Order long-lead items before demolition begins.
- Inspect waterproofing and first fix before anything is closed up.
- Reserve time for snagging and hold a written handover walkthrough.
If you take one thing from this article: plan the sequence before you choose the finish. Almost every renovation regret traces back to that order.